点击此处---> 群内免费提供SAP练习系统(在群公告中)
加入QQ群:457200227(SAP S4 HANA技术交流) 群内免费提供SAP练习系统(在群公告中)
Valuation area 0001 not yet productive with material ledger
Message no. C+020
Diagnosis
The material ledger has been activated for this valuation area, but the
data for materials in the valuation area has not yet been converted.
Procedure for System Administration
If you want to work with the material ledger, choose Accounting ->Controlling -> Product Cost Controlling -> Actual Costing/Material Ledger -> Environment -> Production Startup -> Set Valuation Areas as Productive.
There you can convert the data for the material ledger by following the instructions in the online documentation.
Note
Setting the material ledger to productive cannot be undone.
按提示找到下边目录:
设置了一个后台作业来设置 Set Valuation Areas as Productive:
刚才MM02 开了一个物料的修改,结果 JOB cancel 了
关闭MM02 之后,JOB才跑成功
然后 MM01 可以顺利创建 FICO 视图了。